Location
- New Suez Canal Lane Projects
- El Mosheer Tantawi Bridge / Rd. (5th Settlement)
- Mohamed Ali Fahmy Rd. (5th Settlement)
- Siwa
- El Almen
- El Moghra
Scope of Work:
- Excavation
- Road construction
- Bridges construction
- Water Well Drilling ( 21 well – ± 200 m)
- Water Well Drilling ( 1 well – ± 950 m )